METEC to lose 180,000 hectares of land


https://www.youtube.com/watch?v=5ajzuzVxBsk

Metal and Engineering Corporation (METEC) is working on the Grand Ethiopian Renaissance Dam after the corporation went through restructuring. The reformation includes audits and reorganizing the work plan. If the new plan succeeds, the dam will be completed within four years.

Leave a Reply

Your email address will not be published. Required fields are marked *

+ 28 = 35