Magma Energy Corp. reported this week that is has successfully completed flow testing of its Soda Lake geothermal production well 45A-33, which will have the capacity to produce 3 megawatts (MW) of net power once a turbine system is installed at the site.
Related posts
Drone Attack in Gojjam, Ethiopia, Claims Over 120 Civilian Lives Ahead of Easter Celebrations
Rights Group Urges Halt to Forced Evictions in Ethiopia
Emory University Secures $2.8 Million from Gates Foundation to Combat Urban Malaria in Ethiopia
