{"id":698447,"date":"2010-03-23T07:35:42","date_gmt":"2010-03-23T11:35:42","guid":{"rendered":"tag:greentechnolog.com,2010:\/\/1.2275"},"modified":"2010-03-23T06:51:43","modified_gmt":"2010-03-23T10:51:43","slug":"syracuse-university-partners-w-ibm-and-ny-state-for-green-data-center","status":"publish","type":"post","link":"https:\/\/mereja.com\/index\/698447","title":{"rendered":"Syracuse University Partners w\/ IBM and NY State for Green Data Center"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" hspace=\"3\" height=\"44\" border=\"3\" align=\"left\" width=\"180\" vspace=\"3\" title=\"Green data center logo\" alt=\"Green data center logo\" src=\"https:\/\/i0.wp.com\/www.syr.edu\/greendatacenter\/images\/GDC_header1.png?resize=180%2C44\" \/>Syracuse University&#8217;s new green data center follows LEED guidelines and is both green and energy efficient.&nbsp; <\/p>\n<p>&quot; &#8230; constructed in accordance with LEED &#8230; more than 99 percent of all construction waste &#8230; has been recycled. &#8230; over 1,200 tons &#8230; of waste that did not go to a standard landfill.&quot;<\/p>\n<p>&quot; &#8230; anticipated to  use about 50 percent less energy than a typical data center in operation  today &#8230; &quot;<\/p>\n<p>&quot;IBM intends to showcase the data center and its energy-efficient  technologies to help clients design new data centers or improve their  current operations&#8230;.&quot;<\/p>\n<p>&quot;&#8230; features an on-site electrical tri-generation system that  uses natural gas-fueled microturbines to generate all the electricity  &#8230; will be  able to operate completely off-grid.&quot;<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Via:<\/strong>&nbsp; Syracuse University&nbsp; <a href=\"http:\/\/bit.ly\/9dfjiP\"  title=\"Syracuse University\">LINK <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Syracuse University&#8217;s new green data center follows LEED guidelines and is both green and energy efficient.&nbsp; &quot; &#8230; constructed in accordance with LEED &#8230; more than 99 percent of all construction waste &#8230; has been recycled. &#8230; over 1,200 tons &#8230; of waste that did not go to a standard landfill.&quot; &quot; &#8230; anticipated to [&hellip;]<\/p>\n","protected":false},"author":728,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[4821],"tags":[],"class_list":["post-698447","post","type-post","status-publish","format-standard","hentry","category-news"],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p9NivD-2VHh","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/posts\/698447","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/users\/728"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/comments?post=698447"}],"version-history":[{"count":0,"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/posts\/698447\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/media?parent=698447"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/categories?post=698447"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.com\/index\/wp-json\/wp\/v2\/tags?post=698447"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}