Ethiopian News, Current Affairs and Opinion Forum
Zmeselo
Senior Member+
Posts: 33606
Joined: 30 Jul 2010, 20:43

Mapping and Information Center works on Development Projects

Post by Zmeselo » 28 Apr 2021, 08:18



Mapping and Information Center works on Development Projects

By: Habtom Tesfamichael

https://shabait.com/2021/04/28/mapping- ... ShinesAt30

NATION BUILDING

Apr 28, 2021



Geographic information of land and sea is crucial, for sufficient planning and management of development projects. Sustainable development requires access to data, information, knowledge, and understanding about the environment and natural resources.

The Mapping and Information Center (MIC) of Eritrea was established in 2006, to study and survey the land and sea area of the country. The information gathered by the MIC is given to the decision-makers, for their specific application. The MIC carries out land surveys and gives detailed information useful in development projects such as the construction of water dams, roads, and residential houses. Similarly, it does a sea survey to gather and give information useful for the construction of ports and cableways. The MIC has been a key player in the construction, agriculture and mining sectors.

Generally, the MIC has six desks corresponding to the six regions of Eritrea and works in partnership with 18 ministries and other agencies such as NUEYS, NUEW, PFDJ, and the Commission of Sports.



Ensuring food security is one of the top national priorities, for sustainable development in Eritrea. The country’s food security strategy aims at ensuring that all Eritreans have a sufficient quantity of nutritious food, at an affordable price, at any given time and place within the country. To this end, the Government’s investment is geared towards laying the foundations that help ensure food security; thereby guaranteeing sustainable development.

One of the basic pillars needed to ensure food security and sustainable development is, securing water resources. Eritrea is located in the Sahel region of Africa, one of the driest parts of the continent. It is prone to unpredictable weather conditions and erratic rainfall, which directly affect agriculture and drinking water.

To deal with this problem, the Government of Eritrea has been working to secure water resources by building different sized dams for multi-purpose. If designed correctly, dams allow water to become available at all times- increasing exploitable renewable water resources. More importantly, reserving every drop of water on micro dams sustains the lives of people and ensures sustainable harvest. The construction of dams helps address the scarcity of water and makes water available, for irrigation. Water is also a key resource for industrial plants, construction, mining, and other sectors. The MIC plays an important role in surveying and designing viable areas, for building dams.

Engineer Getachew Merhatsion, head of the MIC, said that
securing water resource is securing the continuity of life.
The annual rainfall of Eritrea, is quite low. A good part of the country gets less than 300mm. of rainfall, a year. Of course, some regions have better rainfall, around 1000mm annually. Overall, the highlands of Eritrea receive a good amount of rainfall during the months of June, July, and August, and much of it goes downstream to either the Red Sea or the lowlands of Eritrea. For this reason, the biggest dams of Eritrea have been built in the lowlands.



As a result of the efforts made to conserve every drop of water, the once drylands have now been transformed to green lands with the construction of hundreds of dams, micro-dams, reservoirs, and check dams. In the last 30 years, around 765 dams have been built in different parts of the country. They range from check-dams with a capacity to hold around 10 thousand cubic meters, to the biggest dams with a capacity to hold around 330 million cubic meters. In addition, around 200 small reservoirs with a capacity of less than 10 thousand cubic meters have been constructed; primarily for use in dairy farming.

Some of the newly built dams include Kerkebet dam (the biggest dam with 330 million cubic meters), Misilam, Gerbera, and Gahtelay dams. The construction of the dams has helped secure drinking water and has enabled farmers to have more than one harvesting season, by practicing irrigation farming.

Electricity is made available at the irrigation farms making it easy to power water pumps, agro-processing plants, and storerooms that are built to preserve and add value to the agricultural products.

Some dams are being used as fish farms, providing communities with much-needed protein-rich diets in their neighborhood.

Community members, take part in the construction of many of the dams. In particular, they are involved in terracing, reforestation, and construction of check-dams. People are now reaping the fruits, of their sweat and toil. They have freed themselves from dependency on food aid, as they are able to grow food any time of the year.

Engineer Getachew said that one of the challenges they were facing in the past was that they were not allowed to import the technology they needed for their work, due to the sanction that had been imposed on Eritrea.

Land transport, is one of the primary necessities for economic growth and sustainable development. Adequate transport infrastructure promotes trade and facilitates development, by increasing connectivity. The MIC plays an important role in surveying and designing road networks, which are then given to relevant ministries and construction companies.



Due to the 30-year war for independence, much of the road infrastructure in Eritrea was destroyed. At independence, Eritrea had 620 km of roads paved with asphalt and 5800 km seasonal roads.

Since then, 1460 km of roads have been paved with asphalt and 3642 km of permanent and 10,000 km of seasonal roads have been constructed. Compared to the total 6420 km that Eritrea inherited at its independence, a total of 15,100 km of roads have been constructed. They include Asmara – Fil-Fil Selemuna — Massawa road, Massawa – Assab, Massawa – Gilbub, Barentu – Tesseney, Afabet – Kubkub – Nakfa, and Massawa – Erafaile, which are some of the longest roads constructed over the years.

Engineer Getachew noted that though the total amount of work that has been done is considerable, a lot remains to be done to interconnect the country. One of their plans is to renovate the seasonal roads, damaged by erosion. The roads that are being renovated include the 110 km Tesseney – OmHajer, the 135 km Binbina – Gergef, 36 km Forto Sawa – Tamarat, 10 km Shambuko – Karkasha and 135 km Kerkebet –Sel’a roads.

The new ring road that runs through Adi-Guaedad- Bet-Gergish- Beleza is planned to be paved with asphalt, while the Massawa-Erafaile-Colluli new road is being widened. Another road construction project underway is the, Massawa – Gulbub – Afabet –Karura. In general, the plan is to pave all the seasonal roads with asphalt.


_______________






ከም መቐጸልታ ናይቲ ምስ ዞባዊ መርበባት ዝተኣሳሰር፡ ብቑዕ፡ ስሉጥን ዘመናዊን ዘቤታዊ መርበባት ጽርግያ ንምዝርጋሕ ዝካየድ ጻዕሪ፡ ኣብ መስመር ዓሰብ- ቡሬ 11 ኪ/ሜትር ዝንውሓቱ ሓድሽ ጽርጊያ ይስራሕ ኣሎ፡፡ "ክተት ንሓባራዊ ዕቤት"! 📷 Almaz: @Almaz85148481
Last edited by Zmeselo on 28 Apr 2021, 08:59, edited 1 time in total.

Zmeselo
Senior Member+
Posts: 33606
Joined: 30 Jul 2010, 20:43

Re: Mapping and Information Center works on Development Projects

Post by Zmeselo » 28 Apr 2021, 08:29

You can't deny he's cute tho, Weasel-martin No-clout! :lol:











Last edited by Zmeselo on 28 Apr 2021, 08:52, edited 1 time in total.

Zmeselo
Senior Member+
Posts: 33606
Joined: 30 Jul 2010, 20:43

Re: Mapping and Information Center works on Development Projects

Post by Zmeselo » 28 Apr 2021, 08:50


A Tigre beauty

Asmara - Peace & Serenity! 📷 Titi G.Habte

One of the many magnificent, Eritrean views! 📷 Ghideon Musa: @GhideonMusa

Badme! 📷 MEHRETAB MEDHANIE: @EriPrism

Zmeselo
Senior Member+
Posts: 33606
Joined: 30 Jul 2010, 20:43

Re: Mapping and Information Center works on Development Projects

Post by Zmeselo » 28 Apr 2021, 09:24



ERITREA: Provisional List

With 3 yellow jerseys, 9x podium, 24 stage wins & 35 riders who graced the biggest race of Africa.



The new generation is coming

👉 Tesfom Sirak

👉 Mehari Tewelde

👉 Goytom Tomas

👉 Weldemicael Sela

👉 Zeray Nahom

#TdRwanda2021: @tour_du_Rwanda

____________


Shannon- Ogbani Abeda is once again readying to represent Eritrea at the Olympics 2022 in China, in skiing. This will be his second outing for his country, if all goes according to plan.

Let's all encourage, this great Eritrean son!

Temt
Member+
Posts: 5279
Joined: 04 Jun 2013, 22:23

Re: Mapping and Information Center works on Development Projects

Post by Temt » 28 Apr 2021, 11:54

መኣዝን ልምዓት - መኽዘን ማይ - ማእከል ስሕበት ዘመናዊ ልምዓት | Water reservoirs role in development - ERi-TV


Temt
Member+
Posts: 5279
Joined: 04 Jun 2013, 22:23

Re: Mapping and Information Center works on Development Projects

Post by Temt » 28 Apr 2021, 12:21

Here is part of the new Asmara Ring Road on the ዓዲ ንፋስ ድርፎ side:



Somaliman
Member
Posts: 4972
Joined: 09 Nov 2007, 20:12
Location: Heaven

Re: Mapping and Information Center works on Development Projects

Post by Somaliman » 28 Apr 2021, 12:52

You can't deny he's cute tho, Weasel-martin No-clout!

I hope you mean the weasel, because that shameful charlatan is far from being cute!

Zmeselo
Senior Member+
Posts: 33606
Joined: 30 Jul 2010, 20:43

Re: Mapping and Information Center works on Development Projects

Post by Zmeselo » 28 Apr 2021, 15:12

Somaliman wrote:
28 Apr 2021, 12:52
You can't deny he's cute tho, Weasel-martin No-clout!

I hope you mean the weasel, because that shameful charlatan is far from being cute!
😂 I meant "cute" in the sense of how criminals always try to appear as innocent as doves with smiles & everything, not his outer appearance.

He looks like a pedo on parole, to me! :lol:

Somaliman
Member
Posts: 4972
Joined: 09 Nov 2007, 20:12
Location: Heaven

Re: Mapping and Information Center works on Development Projects

Post by Somaliman » 28 Apr 2021, 17:23

Yes, I lie sometimes to push my own agenda. So, what? The end justifies the means - Martin Plaut!


This fucker has no qualms of claiming that he lies and backing this up with the saying "The end justifies the means."

Hell no! The end doesn't justify the means, the means can justify the end.

A positive outcome cannot be treated as good, or even positive, if the methods used to obtain it were dishonest, lieful, or injurious/detrimental to others.

This fucker got the message of the adage wrong! The adage hints that how we got there, including the reasons and processes we used to accomplish what we did, matters more than the outcome we've achieved.

For example, what does happen if an athlete admits to doping after winning, let's say a gold medal in the Olympics, and says, "so what? The end justifies the means"? They're stripped of their medal.
Last edited by Somaliman on 28 Apr 2021, 18:55, edited 1 time in total.

Aba
Member
Posts: 4018
Joined: 15 Apr 2011, 17:52

Re: Mapping and Information Center works on Development Projects

Post by Aba » 28 Apr 2021, 18:36

Please wait, video is loading...

Post Reply